Wed Dec 15th - Body work, Move battery box, Front suspension changes
Tues Dec 14th - Body work, Front suspension changes
Mon Dec 6th - Body work, Front clip work
Sun Dec 5th - Body panels, Repairs & improvements to front clip
Sat Dec 4th - Dyno Engine
Thurs Nov 25th - Body panel repairs - Work on prepping brake calipers
for next year
Wed Nov 24th. - Repair body panels, Took front suspension ,
transmission out.
Thoughts on our year:Goals: a podium finish, did that * Improve on
13th in points, did that a 11th, that is a little disappointing since
we raised our goals/hopes because we were in the top10 in points most
of the year.* Run up front to attract a major sponsor, ran up front
but still looking for a title sponsor Overall thought: We race for fun
and we acheived that! Derrick always says " I don't have the
biggest sponsor or budget, but I wouldn't trade my crew for
anything!" For 2000: unless we get major sponsor, the #67 will
run a limited schedule.
1999 Race Season review
* 8 top 15's
* 5 top 5's
* 11th in Eastern points, 2 better than Derrick's rookie year in 1998
* 26th in National points (Did not attend Western National races)
* Best career CASCAR finish 2nd at Cayuga
* Best career CASCAR qualifying 3rd at Fredricton
* 5 fast heat qualifiers
* 2 top 15's on road courses' Mosport & Molson Indy (1st career
roadcourse races)
* 4th at Hamilton Cayuga 250 pit stop competition
Fri Sept 24th - Leave for Kawartha at 2:30pm
Thurs Sept 24th - Load up car, equipment & pit
cart* Wash truck & trailer
After this weekend the crew starts taking the car
apart piece by piece.
Mon Sept 20th - Change rear gear for Kawartha, Change
oil & tune motor
Sun Sept 19th - Day off for the team.
Sat Sept 18th - Barrie was a success; the
race a 10 lapper was fun we finished 3rd behind 02 & 98. Every
driver signed alot of autographs, which is good promotion for CASCAR.
Fri Sept 17 - Clean truck and trailer,
Load up equipment and car
Thurs Sept 16 - Clean car, Finish paint and
letter car for Herbrand tools nite at Barrie Speedway , Time engine
& do bolt check
Wed Sept 15
Body work finished, Minor maintenance for Barrie race
Tues Sept 14 - Clean car up & start body work,
Change rear gear set
Change oil.
Mon Sept 13 -
9:00pm arrive at shop: unload car & pit equipment from trailer
Sept 9th 1999
* Set-up car * Clean up truck& trailer* Leave for
Fredricton around 10:00pm
Sept 8th 1999
* Paint and lettering of car * Double check all changes
and repairs
Sept 7th 1999
* Body panels repaired or replaced * Maintence; ie
oil/lubricants changed/bolt check
Sept 6th 1999 - This is how the week
starts after a crash
* Take body off and all bent parts
Damage: * Left side upper / lower control arms * All
tie rods * Right side upper control
arm * All 4 shocks * Panhard broke & straightened
rear end * Fix crush panels
* Replace all front end parts listed above
August 31st - Sun. nite: * Take out
engine,* Dismount all used tires from rims * Take
out rear gear set * Take suspension off in front end *
Take out battery
& all lead.
Mon nite: * Add lead & battery to
oval set-up * Put on oval suspension *
Put new rear gear set in * Body work * Uniforms to
cleaners * Change oil
pan & oil pick up over for oval * Change
transmission over.
Aug 26th 1999
Update on the Tiemersma Pontiac: Car is scaled
and already to go.* Complete bolt check done* Radio's charged*
Uniforms readyThurs;* Wash truck and trailer* Wax car & pit
cart/war wagon* Team meeting for quick over view of weekend schedule
Aug 25th 1999
Update on the Tiemersma Pontiac: * Fired engine and
tuned it.* Check electric systems.. ie. fans/blowers/alternator. *
Double checked all seat bolts,and safety harness.* Cut spare decals
for car.
Aug 24th 1999
The car decaling and all body work is complete.
Tires and rims already to go . Our Elf fuel has
arrived, and we did a
quick bolt check on chassis parts. Painted spare drive
shaft, reinforced
fuel refiller bracket. Engine tuner Matt/ adjusted and
checked
carburator, as well as fuel line check. He also double
checked
radiator, & rad hoses. The team is really starting
to get pumped about
the weekend. Talk to you tomorrow... Dallas Legge
July 25th 1999 -
Repairs after Cayuga crash.: * left rear 1/4 panel *
rear bumper * rear clip & all rear tin kit/crush
panels * rear end oil cooler pump * rear-end housing *
1 spring * 1 tire & rim * pandhard bar & mount * 2 trailing
arms * drive shaft * transmission * bell housing * clutch* motor
mounts * driver water jug *
flapper over flow valve.
Changes to oval track car for road
courses: * different oil pan and oil pick up * change lead weight
locations to make car neutral * front suspension is totally different
* Car is ready for decalling! Chassis & body work is pretty much
done.
|