Have not heard of upgrades planned to the speedway for this upcoming season, can anyone enlighten everyone on some of the planned upgrades?


46 Replies
Posts: 0
(@racerx)
Joined: 1 second ago

I heard moving the pit entrance to the backstrech, knocking the hill down in turn 2 and re radius to equal turn 3 and 4, widen the complete track by 30ft, and of coarse a complete resufacing(not sure if its asphalt or concrete) 😉


Reply
Posts: 2480
Moderator
(@shadowracer)
Member
Joined: 20 years ago

knocking the hill down in turn 2 and re radius to equal turn 3 and 4,

OK, now I haven't been privy to a lot of info lately, but I can tell you that this part for sure was not a a part of the main plan. As far as I knew, the actual track shape was never on the table to be changed.

Again, the plan may be different now, but that was never part of the original plan as it was given to me after they surveyed it all  a couple years ago..

widen the complete track by 30ft, and of coarse a complete resufacing(not sure if its asphalt or concrete) 😉

Resurface was part of the plan, and any widening (30 feet is pretty generous) was supposedly going to be added around the inside, rather than the outside. Once again, that may have changed.

Having said all this, I haven't heard anything on the table as far as major work for this year. But then I'm not in the loop the way I used to be either.


Reply
Posts: 0
(@shifty333)
Joined: 1 second ago

I heard moving the pit entrance to the backstrech, knocking the hill down in turn 2 and re radius to equal turn 3 and 4, widen the complete track by 30ft, and of coarse a complete resufacing(not sure if its asphalt or concrete) 😉

Ya dont know where you get your info there bud but i think its safe to say you are WAY off


Reply
Posts: 3382
(@barrie97ps)
Famed Member
Joined: 20 years ago

shifty..re-read then notice the winking smiley face.....